Sedimentation Installations

  • Description
Product Detail

Method of inclined-tube settling water is installed above the mud suspended layer dip angle of 60 degrees inclined-tube formation, and suspended solids in raw water, solids or by adding coagulant alum flocs formed after, at the end of tube surface area to accumulate into a thin layer, relying on gravity slide back into mud suspended layer, and then sank into the mud set. Sludge discharge pipe into tank further processing or utilization. Supernatant pipes rose to set out gradually, can be discharged or reused.


Send your message to this supplier
To:  

WED Environmental Engineering Limited

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  
  
You May Like
Not exactly what you want? One request, multiple quotations Get Quotations Now >>
China Mainland Favorites
Transaction Level:

* Quantity:

You May Like