Reinforced Fiberglass Paving Mat

  • Description
Product Detail

Reinforced Fiberglass Paving Mat

??15.gif 

?  Delays reflective cracking 
?  Provides a Moisture Barrier

Easy installation and Less Maintenance 

Fully Millable and Recyclable

Low risk of product shrinkage during the overlay process

Tensile strength, roll length, width and area weight can be tailored according to clients demand. 

Reinforced fiberglass paving mat has a combination structure of Fiberglass Mat + Fiberglass Scrim + Fiberglass Mat. The strong fiberglass mesh embedded into the fiberglass mat is the key factor to its performance, as reinforced fiberglass paving mat extends the life of pavement overlays through the delay of reflective cracking. The Reinforced Fiberglass Paving Mat provides the highest tensile strength with an elongation lower than 5%, making it a strong, commercially available and full coverage paving fabric or paving material.

This product also serves as an effective moisture barrier equal to paving fabrics and mats. The unique, non-woven, fiberglass matrix structure of the Reinforced Fiberglass Paving Mat allows asphalt binder to fully penetrate and fill voids within the fabric, limiting moisture infiltration and preventing water from infiltrating into the granular layers of the pavement structure.

Fiberglass Composite Mat creates innovative solutions to help the paving projects to go smoothly and provides superior performance at airport runway, super highway, parking area and business lots. 

Technical data

Item

SPECIFICATION

Product Name

Reinforced Fiberglass

Paving Mat

Reinforced Fiberglass

Paving Mat

Product Code

FMF125/500

FMF140/800

Structure

Fiberglass Mat +

Fiberglass scrim +

Fiberglass Mat

Fiberglass Mat +

Fiberglass scrim +

Fiberglass mat

Area Weight (g/M2)

125±10

140±10

Fiberglass Mat

Weight (g/M2)

40

40

Width(mm)

1000

1000

Mesh Open (ends/cm)

2.0x1.0

3.0x1.6

MD & CD yarns  (Tex)

68x136

68x136

Roll Diameter(mm)

1180

1180

Core Diameter(mm)

152

152

Moisture(%)

0.8

0.8

Binder Content(%)

25

25

Tensile Strength MD

(N/5cm)

500

800

Tensile Strength CD

(N/5cm)

500

800 

Instruction to use the polyester fiberglass paving mat:
? Remove dirt, gravel and dust from the pavement to assure good adhesion between asphalt and pavement.
? If the road is damaged, it must be repaired to make the surface of the road hard and smooth.
? For a good result, the asphalt binder that will be used to adhere the Paving Mat to the road must be hot asphalt, but not emulsified asphalt.
? The temperature of hot asphalt should be between 163? and 204 ?.
? When the hot asphalt covered the road, the Reinforced Fiberglass Paving Mat must be overlaid onto the hot asphalt before the asphalt lose it’s mobility so as to assure the mat fully soaked by asphalt and effectively provides a moisture barrier.  

? For installation of the Reinforced Fiberglass Paving Mat, the air temperature must be higher than 4 ?.

In order to achieve optimal results, here we provide some Important Notes on installation of Reinforced Fiberglass Paving Mat: 

?Reinforced Fiberglass Paving Mat must be installed on Hot asphalt. We recommend the following asphalt. AC-20; PG64-22; AR8000 +, or the asphalt with penetrate rates 60-80. In extremely hot summer, we recommend to use asphalt with high viscosity, such as AC-30; PG67-22; AR8000 +, or the asphalt with penetrate grade 40-60.
? The best ratio of asphalt is 1.1 liters / square meters paving mat, but subject to the project site situation during installation, the ratio can be between 1.0-1.3 liters / square meters. According to different area weight of the Reinforced Fiberglass Paving Mat, the ratio of asphalt should be adjusted accordingly. During delivery of asphalt, we do not suggest to heat the asphalt with a temperature higher than 204 ?, because this would hinder the pre-mature of liquid asphalt.
? Handle the Reinforced Fiberglass Paving Mat with care during installation, the paving mat may be damaged or it may cause bad result if the paving mat drop from the installation machine.

During the installation, if it forms a stripe bigger than 2.5cm in any direction, the stripes must be cut and overlaid, and the two layers of paving mat must be fully covered by asphalt so as to assure the two layers of paving mat fully soaked by the hot asphalt. Use roller to press the paving mat or use brush to handle the paving mat so as to clear out bubble in the paving mat to assure the paving mat fully adhered to the road. When covering the hot asphalt to the road, the width of asphalt should be 4 inch more than the width of paving mat. Since the paving mat can not be curved, for the winding area of the road the paving mat can be cut into several pieces and be installed to the road manually or mechanically.

For the connection of two pieces of paving mat, the two layers of paving mat must be overlapped together. In the longitudinal direction the width of overlapped area must be at least 10.2cm, and in the lateral direction, the width of overlapped area must be at least 5.1cm.

? If the installation machine or other vehicles have to drive on the paving mat, it should not turn directions frequently or suddenly, so as to avoid damaging the paving mat. Do not scatter sand or other object on the paving mat; to avoid asphalts sticking to the tire of the machine, do not minimize the ratio of bitumen.

Send your message to this supplier
To:  

Nanjing EFG Co., Ltd.

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  
  
Not exactly what you want? One request, multiple quotations Get Quotations Now >>
China Mainland Favorites
Transaction Level:

* Quantity:

You May Like