1 the operator should be familiar with the general performance and structure of the oil pressure machine, prohibit the use of overload.
2 before use, should be lubricated by the provisions of the oil, check the high-pressure pump, pressure gauge, all kinds of valve, sealing ring, etc..
3 before starting, should check whether the mold is complete, whether the material is in line with the requirements, said the material tool is accurate.
4 pressing, touch must be placed on the plate center position, prohibit the use of eccentric. Before each shift, the test pressure should be checked once the mold is cracked.
More than 5 people, to have someone to start, coordinate and cooperate with each other.
6 no hands, head between the die and the pressure head.
7 the work is finished, should be the products, tools, mold finishing well and placed in the designated place.
- PROPERTY OF DISMITE 1 Pieces / (Min. Order)
- 47-ZDC-06-DLXZ 1 Pieces / (Min. Order)
- TOP45-VGA 1 Pieces / (Min. Order)
- OPP-2000 1 Pieces / (Min. Order)
- ROWA SIC MC-pump 1 Pieces / (Min. Order)
- DKC280DC-1 1 Pieces / (Min. Order)
- JCSD-1T 1 Pieces / (Min. Order)
- ZXC 10 1 Pieces / (Min. Order)
- NITROHUMIC ACID 1 Pieces / (Min. Order)