Electric start Diesel Generator 300kw

  • Description
Product Detail

300kw 330kva Doosan diesel generator



Specifications:

Electric start Diesel Generator 300kw

Place of Origin: Guangdong, China (Mainland)

Brand Name: Wagna

Model Number: DL330DO-50

Engine:P158LE-1

Prime Power: 300KW 375KVA

Voltage: 400V/230V adjustable

Speed: 1500/1800 RMP

MOQ: 1 pcs

Alternator:Stamford/WAGNA/Leroysomerr

Controller: Deep Sea/SmartGen.


Product parameter:

Electric start Diesel Generator 300kw

Unit Model set

DL330DO-50

Power 

Prime

Standby

Unit Power rate (KW)

300330

Engine Power rate(KVA)

375413

Engine Model

P158LE-1

Engine manufacturer

Perkins engine

Engine structure

V type 8 cylinders, four stroke, naturally aspirated

Engine cooling modeling

40°C water tank radiator, cooling fan with fan belt drive, safety shield

Governing systemElectronic speed regulation control system

Start mode

24V DC electric start,and equipped with silicon rectifier charging generator

Fuel System

High pressure fuel pump, electronic regulation

Total engine displacement(L)

14.6

Bore*Stroke(mm)

128*142

Compression ratio

15:1

Fuel Consumption of 100% load(g/kw·h)

213

Oil Capacity (L)

17

Coolant Capacity(L)80

Rated voltage / frequency /power factor

400V/230V, 50Hz, 0.8 hysteresis, three-phase four wire

Steady-state frequency change rate

Better than 5%

Insulation Class / Protection Grade

Class H/IP22/23

Telephone influence factor /harmonic  coefficient

TIF<50/THF<2%

Maximum noise level (dB)A

=108

Standard accessories

A start battery and a connecting wire,exhaust pipe, corrugated pipe, flange, damping muffler of a base, a shock absorber

Dimension (mm)

2850*1390*1700

Weight (kg)

2500

Ps. Data of above table changes sometime, for reference only.


Product show:

Electric start Diesel Generator 300kw

2017-07-27_103945 (2).jpg

Doosan 375kva diesel generator.jpg

Doosan engine P158LE-1....jpg

details P158LE-1.jpg

Doosan 300KW diesel generator with canopy..jpg

***Picture for guidance purpose 


Engine:

2017-07-27_111644.jpg

2017-07-21_115933.jpg

FUEL CONSUMPTION

Prime Power (lit/hr)

1,500 rpm

1,800 rpm

25%

2125.2

50%

4046.5

75%

58.467.5

100%

78.791.3

Standby Power (lit/hr)

1,500 rpm

1,800 rpm

25%

23.1
27.3

50%

43.750.3

75%

64.774.2
100%88.3101


ENGINEERING DATA:

Water flow 342 liters/min @1,500 rpm

Heat rejection to coolant 34.3 kcal/sec @1,500 rpm

Heat rejection to CAC 12.4 kcal/sec @1,500 rpm

Air flow 23.5 m3 /min @1,500 rpm

Exhaust gas flow 59.5 m3 /min @1,500 rpm

Exhaust gas temp. 520 °C @1,500 rpm


Alternator: 

Bran: Stamford

Model: HCI 444FS

Number of Phase: 3

Connecting Type: Three Phase and Four Lines

Number of Bearing: 1

Grading Protection: IP23

Altitude: =1000m

Exciter Type: Brushless (AVR automatic voltage regulating)

Insulation Class: H degree

The components of the genset

(1)  DOOSAN Diesel Engine;        (2) Stamford  Alternator;     (3) Control Panel


Control Panel: 

Deep Sea 7320

The protection control panel with the display of frequency table/water temperature/ schedule/ battery voltmeter. The genset with low oil pressure, high water temperature, over speed emergency, stop and other pre-protection.

 

Testing Items of Power Friend Genset:

1) Parts fault testing

2) Fue tank pressure testing

3) Bolt tightening torque testing

4) Painting thickness testing

5) Voltage bearing and insultion testing

6) Noise testing

7) Loading testing: All qualified generator sets are subjected to a comprehensive performance test which inclides 0% load, 25% load, 50% load, 75% load, 100% load and 110% load and to check, verify that all control systems, alarm and shut-own protection.

 

FAQ:

1.how many hours you will get the reply to the inquiry?

Answer: We will reply you within 48 hours

 

2.What’s the frequency of diesel generators?

Answer: 50/60HZ

 

3.What is your MOQ?

Answer: Our MOQ is only 1 set for diesel generator and Gas generator, MOQ 50 pcs for gasoline generator, digital inverter.

 

4.What is your payment method?

Answer: Payment method usually is 30% T/T as deposit, 70% balance T/T before delivering. Or 30% T/T as deposit, balance by 100% L/C at sight.

 

5.How many days for delivery time?

Answer: Delivery period normally will be 10~45 days after receiving customers' deposit.

2017-06-23_105418.png

Send your message to this supplier
To:  

Guangdong Wagna Power Technology Co.,Ltd

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  
  
You May Like
Not exactly what you want? One request, multiple quotations Get Quotations Now >>
China Mainland Favorites
Transaction Level:

* Quantity:

You May Like